SDL 0.00% 0.6¢ sundance resources limited

Hi taboon. The dam to be built is to be called Cholet Hydro Dam....

  1. 8,602 Posts.
    lightbulb Created with Sketch. 40
    Hi taboon.

    The dam to be built is to be called Cholet Hydro Dam. ( Quote) The EP92 is a material risk, Working on the EP92 nothing certain yet. The new road will be of great assistance to us.
    Temporary landing ramps at Lolabe built to get most of the equipment to the port area and allow start to building the railway and its access road. The road would help get equipment into Doula and then to Mbalam and other intermediate point as the railway would start from a number of fronts.
    The material off take wharf built into the port dose not need Kribi stage 2. If stage 2 is finished before then we will use it as required, if not finished it wont stop us.
    One good sign is that the Cameroon President Paul Biya has been invited to China to meet President Xi. Unfortunately I don't currently have insight into timing of that visit.


    Giulio Casello. CEO.

    Regards
    Westcott.
    As I keep saying, it depends on what you ask as to what you are told.
 
watchlist Created with Sketch. Add SDL (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.