KGL 0.00% 9.5¢ kgl resources limited

“The feasibility study at Burnakura was delayed for several...

  1. 14,115 Posts.
    lightbulb Created with Sketch. 4079
    “The feasibility study at Burnakura was delayed for several reasons, the most significant being tight contractor and consultant availability. The feasibility study results will be available early in April 2012.”

    When I told Simon this he told me I must have read it wrong.
    He was heading into a meeting as I got off the phone so I have just sent him an email with the quote above.
    Hopefully he will put a correction out soon.
 
watchlist Created with Sketch. Add KGL (ASX) to my watchlist
(20min delay)
Last
9.5¢
Change
0.000(0.00%)
Mkt cap ! $61.57M
Open High Low Value Volume
9.3¢ 9.5¢ 9.3¢ $4.369K 46.76K

Buyers (Bids)

No. Vol. Price($)
1 977 9.5¢
 

Sellers (Offers)

Price($) Vol. No.
9.6¢ 5801 1
View Market Depth
Last trade - 16.10pm 06/09/2024 (20 minute delay) ?
KGL (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.