Awoonga,
So you posted:
"As you would appreciate, transport has a schedule to meet, i.e load onto truck to meet ship leaving by a certain date. We have seen the ball mill being loaded. We were told that this would be shipped mid October. If it was shipped mid October, then it would have arrived in Brazil by now."
brpuffnstuff posted:
"I've shipped mills before and I'd allow a month minimum before it's shipped and cleared, and as far as as shipping by road once it gets there, permits to carry something that big on the roads are a pain in the butt. It could be a couple of weeks just to sort out those permits before it moves from the docks. "
Have YOU shipped mills before?
Where do YOU think it is?
Do you have a response for brpuffnstuff, or are you intending to ignore his post?
- Forums
- ASX - By Stock
- AVB
- Quarterly
Quarterly, page-51
- There are more pages in this discussion • 137 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)