TMR 0.00% 0.4¢ tempus resources ltd

HIGHLIGHTS FROM THE QUARTEROperational Highlights: Production+...

  1. 2,904 Posts.
    HIGHLIGHTS FROM THE QUARTER
    Operational Highlights: Production
    + Tonnage mined underground at Cinabrio increased to 246,743 tonnes,
    a 64% improvement over the previous quarter.

    + The average head grade of ore mined during the quarter averaged 1.17%
    copper. Grades increased during the quarter with June production averaging
    1.33% copper.


    + Mill throughput increased by 32.6% to 225,502 tonnes milled.


    + Copper in concentrate production increased by 38.2% to 1,818 tonnes.


    + Sales of Metal in concentrate increased by 37.6% to 1,714 tonnes copper.

    + Sales of Silver
    in concentrate increased by 87.7% to 33,436 oz’s Silver.

    +Development of the Cinabrio decline by independent contract mining
    continued during the quarter with the decline being developed to below the
    245 RL level.

    + Underground development for future mining, which is capitalized, increased
    by 87.7% to 1,113 metres for the quarter, while development of mining
    areas, which are expensed as current mining costs, increased by 78.8% to
    819 metres. Total development for the quarter of 1,932 metres,
    demonstrated an increase of 881 metres or 83.7 % over the previous
    quarter.


    + Average operating cash costs of US$2.25/lb payable copper were achieved
    for the quarter. Operating cash costs of US$2.15/lb payable copper were
    achieved in the June 2008 production month.
 
watchlist Created with Sketch. Add TMR (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.