Queensland Labor destroys 100 klms of Great Dividing Range in CQ for 401 wind towers, page-8

  1. 8,064 Posts.
    lightbulb Created with Sketch. 21
    I know the Geotechnical engineer working on that project.
    They can’t even get a drilling rig to the sites without taking the rigs apart, dragging the parts up to site and putting them back together.
    You think they are going to get the windmill monstrosities up there, the thousands of tonnes of concrete required for foundations and the transmission lines in place without causing extreme environmental damage.
    The project is a disgrace and typical of the climate cult nutters prepared to destroy pristine environment for some crazy renewable thought bubble.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.