To get a relationship to the big number by Paul h, and whilst not suggesting a purchase of a rig I am curious to know what the cost of a sizeable rig plus generators,mud pumps, steel cable and others spares that are required to operate a rig. I also mean to exclude such things as site clearance mud dam, drill pipe, surface pad which are are the cost of the well and not the rig. There is also the cost of the drillers wages which are not part of the rig capital cost but an operating cost. Does any have a handle on this number just for clarity sake?
- Forums
- ASX - By Stock
- CTP
- query on drilling plans
query on drilling plans, page-26
-
-
- There are more pages in this discussion • 18 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CTP (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $39.49M |
Open | High | Low | Value | Volume |
5.4¢ | 5.4¢ | 5.3¢ | $7.897K | 148.5K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 63969 | 5.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.4¢ | 31690 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 63969 | 0.053 |
3 | 283254 | 0.052 |
4 | 561685 | 0.051 |
4 | 375000 | 0.050 |
3 | 40418 | 0.041 |
Price($) | Vol. | No. |
---|---|---|
0.054 | 31690 | 1 |
0.058 | 100000 | 1 |
0.060 | 99559 | 2 |
0.062 | 11500 | 1 |
0.069 | 200000 | 1 |
Last trade - 16.10pm 08/11/2024 (20 minute delay) ? |
Featured News
CTP (ASX) Chart |
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online