looks like about 100 cubic metres of ore outside the RoD portal, which is about 300 tonnes and the access road is narrow so only a small tipper could move it to Woods Point - guess 20 to 30 truckloads
guess they will move it soon so they have space to set up the equipment needed to support internal drilling activity, also a good idea would be to send that ore through the plant at WP to find out its grade