You will have to be a little more specific as to what you are trying to calculate. Do you mean gold content per cubic meter?
If you are looking at drill hole results they will typically show a gold grade (grams per tonne) and the length of the intercept (meters). As part of the drilling program there will be a density calculation too but that is not usually shown in the releases.
- Forums
- General
- Question Calculation value per meter
Question Calculation value per meter, page-2
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)