PDC or Perth Design Company designed the mine. Generated engineering drawings and detailed drawings
A company called 3D did the design of the Storage Facility at Geraldton.
Ansteel in Bayuquan fabricated the steel. It was all stick steel with no pre-assembly. Ansteel shipped the 15,000 tonnes of steel in containers and break-bulk to Australia where it was sent to site and erected.