FAR 1.06% 46.5¢ far limited

question for ya on flow testing, page-5

  1. Ya
    6,809 Posts.
    lightbulb Created with Sketch. 3829
    First step post logging is called Completions, ie run casing secure the openhole & then run a cement bond log. Once thats done they pressure test teh BOP etc, make up TCP guns, packer DST test string, run all those in. Takes 5-7 days trouble free basis. An Operator ensures that the BOP's r working first & foremost, prior to a DST.

    Then fire the guns, perforate the lower test zone firstup (assuming its not a comingled test) & measure the flowrate, pressure on the surface. Set isolation plug & then perforate the top sands or whatever they prefer. So 14-16 days in all.
 
watchlist Created with Sketch. Add FAR (ASX) to my watchlist
(20min delay)
Last
46.5¢
Change
-0.005(1.06%)
Mkt cap ! $42.97M
Open High Low Value Volume
47.0¢ 47.0¢ 45.5¢ $31.34K 67.88K

Buyers (Bids)

No. Vol. Price($)
1 3338 46.0¢
 

Sellers (Offers)

Price($) Vol. No.
47.0¢ 199900 2
View Market Depth
Last trade - 15.59pm 13/09/2024 (20 minute delay) ?
FAR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.