  1. Ya
    6,809 Posts.
    lightbulb Created with Sketch. 3829
    The first 2 wells should b quicker based on a trouble-free basis (ie no mechanical issue or weather evac's) whilst the last one will take time esp. with flow testing & coring. So roughly ballpark 60-70 days/well & wrap up the 3 well drilling program by October end-Wk1 or 2 in Nov & release the rig for tow to Offshore Victoria.

    D#3 will b cracker once they drill past 3700m depth or after setting the 9" casing, as it sort of twins D#1 discovery well at the crest & by my estimates its in the top 5 wells offshore in Oz with a high net to gross (79.6m net) oilpay in Oz (rest were at the Lam/Cor oilfield in the mid-90's & that field has flowed over 210 mmbbls since Nov'99). Not sure how they'll approach the testing at D3 as logic suggests atleast perforate 2 zones at the top & bottom and then do a co-mingled cleanup. Oil quality is same as Wanaea-Cossack, 48-49 API just needs a BOPD estimate north of 4k.
    Do keep an eye on Mtrffc for any vessel movement after wk3 or 4. Hope this helps.
 
watchlist Created with Sketch. Add CVN (ASX) to my watchlist
(20min delay)
Last
17.0¢
Change
0.000(0.00%)
Mkt cap ! $304.1M
Open High Low Value Volume
16.5¢ 17.0¢ 16.0¢ $1.073M 6.516M

Buyers (Bids)

No. Vol. Price($)
2 490498 16.5¢
 

Sellers (Offers)

Price($) Vol. No.
17.0¢ 1505581 16
View Market Depth
Last trade - 16.10pm 18/11/2024 (20 minute delay) ?
CVN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.