Presumably you can not log the cased section of a well. It would therefore depend on the stability of the formation through the various target zones as to whether you needed to wireline and case in a progressive manner as was done on Faucon.
If the last 12 1/4" uncased section is the target section then Flamant is a big target. 1265 metres compared with 465 metres for Pelican.
Note I am not a drilling expert and have spent 0 years on a rig.
- Forums
- ASX - By Stock
- HDR
- question on results delay...618
HDR
hardman resources limited
question on results delay...618, page-8
-
- There are more pages in this discussion • 12 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)