HDR hardman resources limited

Presumably you can not log the cased section of a well. It would...

  1. 480 Posts.
    lightbulb Created with Sketch. 1
    Presumably you can not log the cased section of a well. It would therefore depend on the stability of the formation through the various target zones as to whether you needed to wireline and case in a progressive manner as was done on Faucon.

    If the last 12 1/4" uncased section is the target section then Flamant is a big target. 1265 metres compared with 465 metres for Pelican.

    Note I am not a drilling expert and have spent 0 years on a rig.
 
watchlist Created with Sketch. Add HDR (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.