In the latest update it says:
"Flow back operations are expected to commence today on both Matilda Bay 2-15HBK and Matilda Bay 1-15HBK wells. Following the flow back on Matilda Bay 1-15H that well bore will have its sleeves drilled out and a series of tests performed to determine the pressure loss point which will then be repaired and the balance of the frack treatment will be conducted as a plug and perforation technique."
What does this mean? How can they flowback BOTH wells when Matilda Bay 1-15-HBK frack was/is suspended?
Anyone?