In the latest update it says:
"Flow back operations are expected to commence today on both Matilda Bay 2-15HBK and Matilda Bay 1-15HBK wells. Following the flow back on Matilda Bay 1-15H that well bore will have its sleeves drilled out and a series of tests performed to determine the pressure loss point which will then be repaired and the balance of the frack treatment will be conducted as a plug and perforation technique."
What does this mean? How can they flowback BOTH wells when Matilda Bay 1-15-HBK frack was/is suspended?
Anyone?
c
- Forums
- ASX - By Stock
- question to the board
In the latest update it says:"Flow back operations are expected...
-
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SSN (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online