[Well Testing] ID: 8053
The final buildup sequence in a drillstem test. The initial shut-in period is usually followed immediately by an extended period of flow. The well is then shut in for the final buildup period. Data obtained during this period are analyzed to determine permeability thickness, kh, and skin effect, s. Final flow periods commonly range from 4 to 24 hours, and final buildup periods from 6 to 48 hours
[Well Testing] ID: 8053 The final buildup sequence in a...
Add to My Watchlist
What is My Watchlist?