LTR 1.69% $1.16 liontown resources limited

@swkingKV PFS may cover the brief projections for the project...

  1. 5,916 Posts.
    lightbulb Created with Sketch. 19362
    @swking
    KV PFS may cover the brief projections for the project value as a vertically integrated project producing Hydroxide but the main part we are interested in the PFS is the mine and concentrate plant costs.

    A cost of hydroxide plant is a simple thing as it's quite a standard process plant because the the input has to be %6 standard spodumene concentrate feedstock. The cost of the plant will change by the capacity of annual output of lithium hydroxide.

    PFS will reveal the costs associated with the mine design (open pit and/or U/G), the process design to achieve the %6 spodumene concentrate and of course the mine life. That is the main thing we are interested in here.

    After having the PFS then it's easy to make a IPFS (Integrated PFS) as KD did.

 
watchlist Created with Sketch. Add LTR (ASX) to my watchlist
(20min delay)
Last
$1.16
Change
-0.020(1.69%)
Mkt cap ! $2.812B
Open High Low Value Volume
$1.19 $1.19 $1.16 $15.36M 13.12M

Buyers (Bids)

No. Vol. Price($)
18 147576 $1.16
 

Sellers (Offers)

Price($) Vol. No.
$1.17 85567 3
View Market Depth
Last trade - 16.10pm 07/06/2024 (20 minute delay) ?
Last
$1.16
  Change
-0.020 ( 2.13 %)
Open High Low Volume
$1.19 $1.19 $1.16 2578713
Last updated 15.59pm 07/06/2024 ?
LTR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.