1.Can anyone add some light as to why Flamant was only drilled to 3299 mtrs when TD was to be 3370 mtrs. i.e short by 71 mtrs?
2.Any guesses as to how long it takes to interpret wireline logs for a gas well?
3.How long if there is oil as well as gas???
Angers