I understood that there was only a thousand foot stuck. If this is the case, and they have been going for several days already, then they may be finished before or on the weekend, ie within the time specified. As I posted before - a finish on Friday is very possible. If this is the case and the cement job is good then they MAY (and this is a big MAY based on hiccups so far on this well) start drilling on the weekend, allowing 24 hour to run the drill string and less than 200 foot (likely less than 100 foot) to leadville through soft rock, this may take less than 48 hours from finish recovery to Leadville.
I know I'm dreaming as there will no doubt be another two week delay for something. I'm in up to my neck already so no need to top up, though maybe I can use a snorkle! Might be time for those that have left waiting for 40s to consider a position as this boat may take off at high speed very shortly.
Don't wait for Friday, may be 90c to $1.00 by then.
GDN Price at posting:
0.0¢ Sentiment: Buy Disclosure: Held