Unless a portion of northern ep112 can be negotiated back to the company, our progress has been cramped by the santos jv in the sense that the envestra pipeline from our recently acquired palm valley field run almost directly across the waterhouse prospect (rated as a 2.7tf prospect) and would require very short connection to that pipeline. Although the prospect has been drilled 3 times, none of these well penetrated the target formations. Even if it was found that the prospect is of smaller size or ability to deliver large flows, the infrastructure for connection is economically close by and would therefore eliminate the problems of getting large discoveries to market in our sparse acreages. Further comments please....
- Forums
- ASX - By Stock
- quickstart prospects
Unless a portion of northern ep112 can be negotiated back to the...
-
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CTP (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $38.48M |
Open | High | Low | Value | Volume |
5.4¢ | 5.4¢ | 5.2¢ | $20.01K | 377.6K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 394141 | 5.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.3¢ | 65000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 394141 | 0.052 |
3 | 547516 | 0.051 |
1 | 400000 | 0.050 |
3 | 495000 | 0.049 |
1 | 150000 | 0.042 |
Price($) | Vol. | No. |
---|---|---|
0.053 | 65000 | 1 |
0.054 | 100000 | 1 |
0.055 | 60757 | 1 |
0.056 | 112500 | 2 |
0.058 | 220000 | 2 |
Last trade - 12.47pm 04/10/2024 (20 minute delay) ? |
Featured News
CTP (ASX) Chart |