BTL beetaloo energy australia limited

RaaS Research Report $1.32 Valuation, page-6

  1. 322 Posts.
    lightbulb Created with Sketch. 39
    From Falcon

    https://www.*.co.uk/companies/news/910424/falcon-oil--gas-says-kyalla-well-will-be-sidetracked-to-overcome-drilling-challenges-910424.html

    Great and bad. (just my opinion)

    Bad.
    Kyalla well will be sidetracked
    This will set back results by a couple of Months I guess.

    Great.
    Looks like a fantastic reservoir to me but I'll go with company 'good' reservoir. Love natural Fractures.

    Despite the operational set back, the company noted that results obtained to date show the target shale formation has good reservoir continuity, conductive natural fractures, and continuous gas shows.Falcon chief executive Philip O’Quigley said: “Whilst it is unfortunate to have encountered these operational difficulties, which will add to the time and cost to drill the horizontal section, the JV remains as optimistic about the potential of the Kyalla and we look forward to updating the market with further updates in due course.”


    Falcon Oil & Gas says Kyalla well will be sidetracked to overcome drilling challenges“Whilst it is unfortunate to have encountered these operational difficulties, which will add to the time and cost to drill the horizontal section, the JV remains as optimistic about the potential of Kyalla," chief executive Philip O'Quigley saidFalcon Oil & Gas Ltd (LON:FOG, CVE:FO) told investors that the Kyalla 117 N2-1H well, at the Beetaloo shale project, will undergo sidetrack drilling after the well’s original horizontal section experienced operational challenges.The Australian shale well’s vertical section was completed in November, and, horizontal drilling subsequently began in early December. After 700 metres - of a section intended to span at least 1,000 metres - drilling challenges were encountered affecting the maintenance of clean hole conditions and stability in certain sections.As a result, the original production section will be plugged, in line with regulatory requirements, before the sidetracking and drilling of a new horizontal production section.READ: Falcon Oil & Gas confirms strong financial positionThe company noted that such work is not uncommon in an exploration drilling program like this.It is expected that the new drilling will start next month. Fracture stimulation activity will only occur after the successful completion of drilling and the integrity of the well is tested and verified.Despite the operational set back, the company noted that results obtained to date show the target shale formation has good reservoir continuity, conductive natural fractures, and continuous gas shows.Falcon chief executive Philip O’Quigley said: “Whilst it is unfortunate to have encountered these operational difficulties, which will add to the time and cost to drill the horizontal section, the JV remains as optimistic about the potential of the Kyalla and we look forward to updating the market with further updates in due course.”
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
24.0¢
Change
0.000(0.00%)
Mkt cap ! $296.2M
Open High Low Value Volume
24.0¢ 24.0¢ 23.5¢ $134.5K 563.7K

Buyers (Bids)

No. Vol. Price($)
4 156680 23.5¢
 

Sellers (Offers)

Price($) Vol. No.
24.0¢ 100000 1
View Market Depth
Last trade - 16.10pm 25/07/2025 (20 minute delay) ?
BTL (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.