Installation went as planned by the looks of it, just need to wait on them fraccing it and production testing now.
01/09/2012 06 20370 SLIDE & ROTATE DRLD LATERAL TO 20370'; RAN 3 1/2" SLOTTED LNR & DROPPED OFF @ 14406' TOP, BTM @ 20243'; SET PROD PKR @ 14438'; RAN 2 7/8" TBG; INSTALL WELLHEAD TREE; WOCR;