AGO 0.00% 4.5¢ atlas iron limited

rail costing, page-17

  1. 1,025 Posts.
    lightbulb Created with Sketch. 187
    loganqld,

    Good summary but you might want to adjust your cost per km of rail up to between 6-8M per km. The country to get out to McPhee creek is quite rough and will require the additional cost imo. Can't confirm the FMG tonnage rate but I do know that Rio run 232 wagons each holding ~105t giving around 24-25,000t per train.

    This additional cost to build strengthens your arguement for a dual use option as opposed to another independent rail.

    Been watching this one for a long time and used to own but not currently. (Would like to though)

    Good luck all....Maxi
 
watchlist Created with Sketch. Add AGO (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.