SB, the first pilot plant tests were carried out on seven cores taken from the centre of the line of strike at LM. "The samples were selected by CuDeco's geology department in oreder to provide ore representative of central Las Mineral which will be required to be processed through the processing plant, and therefore provide critical information for processing plant engineering design." Ann. of 26/8/10.
I spoke to Peter Hutchison who stated that the reason for selecting the richer ore was to ensure that the plant would be able to process it efficiently, as that was what the full scale plant would be required to do.
CDU Price at posting:
$2.06 Sentiment: Sell Disclosure: Not Held