I believe the timetable for rail has been pushed back.
This is due to something Wah Nam wanted to be sorted out.
Negotiations with FMG are still on-going. A favourable rersult is expected before Christmas.
I have heard that the NWIOA is together negotiating with QR for a rail solution as well. This would be a new railway line probably built for Hancock.