The way I read the ann was that there were negotiations being conducted in relation to conducting a "study" into rail (part of the ongoing scoping/BFS) and not negotiations with a third party to actually "build" a rail.
Semantics maybe, but 2 very different processes.
- Forums
- ASX - By Stock
- AEV
- rail
rail, page-5
Featured News
Add AEV (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $21.14M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
AEV (ASX) Chart |
Day chart unavailable