PLS 3.09% $3.14 pilbara minerals limited

The 2022 June 1/4ly (in part) as follows.Whilst the volume...

  1. 1,522 Posts.
    lightbulb Created with Sketch. 98
    The 2022 June 1/4ly (in part) as follows.
    Whilst the volume appears to be up on the corresponding period last year, the price per tonne will be reduced.
    " KEY POINTS Production and sales • Production of 127,236 dry metric tonnes (dmt) of spodumene concentrate (56%increase from the March 2022 Quarter: 81,431 dmt), including first concentrate fromthe Ngungaju Plant’s fines circuit.• Spodumene concentrate shipments of 132,424 dmt (127% increase from the March2022 Quarter: 58,383 dmt). This included a ~20,000 dmt cargo originally scheduledfor departure in late March 2022, which ultimately departed on 7 April 2022.• Annual FY22 production of 377,902 dmt (34% increase from FY21: 281,098dmt), at theupper end of the guidance range of 340-380,000 dmt.• Annual FY22 shipments of 361,035 dmt (28% increase from FY21: 281,440 dmt)." etc.
 
watchlist Created with Sketch. Add PLS (ASX) to my watchlist
(20min delay)
Last
$3.14
Change
-0.100(3.09%)
Mkt cap ! $9.450B
Open High Low Value Volume
$3.19 $3.20 $3.10 $101.3M 32.04M

Buyers (Bids)

No. Vol. Price($)
30 274897 $3.13
 

Sellers (Offers)

Price($) Vol. No.
$3.14 246919 7
View Market Depth
Last trade - 16.10pm 17/06/2024 (20 minute delay) ?
Last
$3.13
  Change
-0.100 ( 3.43 %)
Open High Low Volume
$3.17 $3.20 $3.10 15825747
Last updated 15.59pm 17/06/2024 ?
PLS (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.