The jv lithium hydroxide refinery in South Korea was opened at the end of last month.
Train1 will produce 21,500 tpy of LiOH.
By my rough calculations, the plant will need feed of about 15,000 tonne per month of spod to produce the amount required fornameplate.
At the end of September a shipment of PLS spod was sent to Gwangalang.
I would assume ramping of the plant would have commenced soon after.
I don’t expect that the plant is yet up to speed but much of that first shipment may have already gone through.
I would not be surprised to see one of the shipments out of Port Hedland to go to South Korea every month from now on.
- Forums
- ASX - By Stock
- Ramp up of next PLS shipment...
The jv lithium hydroxide refinery in South Korea was opened at...
-
- There are more pages in this discussion • 229 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PLS (ASX) to my watchlist
|
|||||
Last
$3.02 |
Change
0.080(2.72%) |
Mkt cap ! $9.090B |
Open | High | Low | Value | Volume |
$3.01 | $3.04 | $2.96 | $59.25M | 19.70M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
7 | 40915 | $3.01 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$3.02 | 318781 | 14 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
7 | 40915 | 3.010 |
7 | 37866 | 3.000 |
18 | 196133 | 2.990 |
19 | 462739 | 2.980 |
11 | 169579 | 2.970 |
Price($) | Vol. | No. |
---|---|---|
3.020 | 183812 | 11 |
3.030 | 219899 | 15 |
3.040 | 292400 | 15 |
3.050 | 216981 | 29 |
3.060 | 99644 | 14 |
Last trade - 16.10pm 11/07/2024 (20 minute delay) ? |
Featured News
PLS (ASX) Chart |