I think with confirmed shipped and estimated loads including the one at pH2 at the moment we are meeting the mid range of guidance (~80k) so far and it depends On timing and load of the last ship of the quarter scheduled for the 24th if we go higher or exceed guidance.as previously stated, all not relevant long term, better to ship later with rising prices, etc...
- Forums
- ASX - By Stock
- Ramp up of next PLS shipment...
I think with confirmed shipped and estimated loads including the...
-
- There are more pages in this discussion • 2,004 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PLS (ASX) to my watchlist
(20min delay)
|
|||||
Last
$3.05 |
Change
-0.100(3.17%) |
Mkt cap ! $9.185B |
Open | High | Low | Value | Volume |
$3.13 | $3.15 | $3.02 | $74.55M | 24.33M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 89482 | $3.04 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$3.05 | 37502 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 89482 | 3.040 |
6 | 31294 | 3.030 |
20 | 208232 | 3.020 |
16 | 406489 | 3.010 |
68 | 314428 | 3.000 |
Price($) | Vol. | No. |
---|---|---|
3.050 | 21000 | 2 |
3.060 | 10330 | 1 |
3.070 | 79133 | 7 |
3.080 | 148351 | 10 |
3.090 | 60000 | 4 |
Last trade - 16.10pm 04/10/2024 (20 minute delay) ? |
Featured News
PLS (ASX) Chart |