PLS 1.50% $3.94 pilbara minerals limited

The 2022 June 1/4ly (in part) as follows.Whilst the volume...

  1. 1,516 Posts.
    lightbulb Created with Sketch. 95
    The 2022 June 1/4ly (in part) as follows.
    Whilst the volume appears to be up on the corresponding period last year, the price per tonne will be reduced.
    " KEY POINTS Production and sales • Production of 127,236 dry metric tonnes (dmt) of spodumene concentrate (56%increase from the March 2022 Quarter: 81,431 dmt), including first concentrate fromthe Ngungaju Plant’s fines circuit.• Spodumene concentrate shipments of 132,424 dmt (127% increase from the March2022 Quarter: 58,383 dmt). This included a ~20,000 dmt cargo originally scheduledfor departure in late March 2022, which ultimately departed on 7 April 2022.• Annual FY22 production of 377,902 dmt (34% increase from FY21: 281,098dmt), at theupper end of the guidance range of 340-380,000 dmt.• Annual FY22 shipments of 361,035 dmt (28% increase from FY21: 281,440 dmt)." etc.
 
watchlist Created with Sketch. Add PLS (ASX) to my watchlist
(20min delay)
Last
$3.94
Change
-0.060(1.50%)
Mkt cap ! $11.85B
Open High Low Value Volume
$3.97 $3.98 $3.92 $45.64M 11.56M

Buyers (Bids)

No. Vol. Price($)
12 124367 $3.93
 

Sellers (Offers)

Price($) Vol. No.
$3.94 285456 7
View Market Depth
Last trade - 16.10pm 24/05/2024 (20 minute delay) ?
Last
$3.94
  Change
-0.060 ( 1.94 %)
Open High Low Volume
$3.97 $3.98 $3.93 3821476
Last updated 15.59pm 24/05/2024 ?
PLS (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.