>The arrangement is for
SARCO to eventually have 70% participating interest
in a joint venture in bauxite production when a mining
licence is issued over an area to be determined
after completion of a survey and a mine feasibility
study.
Thanks Apollo,
Sydney6791,
With the above in mind do you think that maybe it is you that is being misleading?