MGO 0.00% 14.0¢ marengo mining limited

Either way the DST is not a deal breaker for MGO.They have the...

  1. 82 Posts.
    Either way the DST is not a deal breaker for MGO.
    They have the option of building a tailing dam for app. $150m.

    I dont think the delay in the DFS has anything to do with the DST, sure that is their preferred option but its not hard for them to model the DFS on the 2 scenarios. The delay is the negotioation of complex Fixed-EPC contract which they have to get right from the get go (or it will come back to haunt them).
 
watchlist Created with Sketch. Add MGO (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.