Could anyone share some light on all the delays that are going on Example .
Ray 6 was meant to be Fracked in Aug .
Posted 27/July . by AZZ
"operations have concluded on the Ray No. 6 with the well reaching a total measured depth of 10,306 feet. This well is .3 miles east of the Ray No. 5 that was completed in late April. The Ray No. 5 is still on natural flow with average June production rates in excess of 500 BOEPD. The Ray No. 6 is currently scheduled to undergo a multi-stage fracture stimulation in late August."
22/Aug . Op.Update .
"Drilling operations have concluded on the Ray No. 6 with the well reaching a total measured depth of 10,306 feet. The Ray No. 6 is currently scheduled to undergo a multi-stage fracture stimulation in early October."
Approx 6-8 week push out and this would be one that they are expecting big results , would think that it would be pushed along , but then I would say they have a fair idea what is there and maybe best to delay for other reasons ??.