Could anyone share some light on all the delays that are going on Example .
Ray 6 was meant to be Fracked in Aug .
Posted 27/July . by AZZ
"operations have concluded on the Ray No. 6 with the well reaching a total measured depth of 10,306 feet. This well is .3 miles east of the Ray No. 5 that was completed in late April. The Ray No. 5 is still on natural flow with average June production rates in excess of 500 BOEPD. The Ray No. 6 is currently scheduled to undergo a multi-stage fracture stimulation in late August."
22/Aug . Op.Update .
"Drilling operations have concluded on the Ray No. 6 with the well reaching a total measured depth of 10,306 feet. The Ray No. 6 is currently scheduled to undergo a multi-stage fracture stimulation in early October."
Approx 6-8 week push out and this would be one that they are expecting big results , would think that it would be pushed along , but then I would say they have a fair idea what is there and maybe best to delay for other reasons ??.
Could anyone share some light on all the delays that are going...
Add to My Watchlist
What is My Watchlist?