DLS 0.00% 69.0¢ drillsearch energy limited

re:buy?to be or not to be?, page-49

  1. 590 Posts.
    re: mulberry 6 update - 220m reached..... Re: Mulberry 6 – Progress Report No. 2 - Tintaburra Block, Q
    Drillsearch Energy Limited announces progress for the Mulberry 6 development well
    at the Mulberry field.
    Well Details
    Name: Mulberry 6 Development Well
    Permit: PL.39 - ATP299P, Tintaburra Block
    Rig: Precision PDI-735
    Programmed
    Total Depth: 1,300 metres (“TD”)
    Location: Approximately 300 metres south/east of Mulberry 1 well.
    Objective: Birkhead Formation
    Progress: At 600 hours on 1st March, 2006, the well was at 220 metres
    after running and cementing 8 5/8” casing. Currently testing
    blow out preventers (“BOP’s”) prior to drilling ahead.
 
watchlist Created with Sketch. Add DLS (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.