    Looking at the original well plan the current WH3 well was not drilled to the planned length. It may be that the JV believed they had intersected enough fractures to achieve a good testwithout the additional cost of drilling.


    Can someone explain whether it should be possible to go back in and extend the horizontal section for another hundred meters or to the next major fracture ?
 