Good thought but LYC seems to be selling everything produced, hence the need to start up Train 4. This should increase production by 33% . it is my expectation that Production costs will not increase by as much and there will be an advantage in economy of scale. Train 4 as announced in Qtly can be expected around March 2016. It is a significant change so expect an announcement or two.
Then the LT contracts and new buyers will happen. Have patience Luka the force is strong in this one.
In the mean time there is nothing to see here move along.
IMO share price will languish for a while, short term opportunities for traders. Then price will move in anticipation of increased production, usual suspects will cry pump and dump and all will be back to normal.
- Forums
- ASX - By Stock
- LYC
- re entry point?
re entry point?, page-2
-
- There are more pages in this discussion • 11 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LYC (ASX) to my watchlist
(20min delay)
|
|||||
Last
$6.92 |
Change
-0.020(0.29%) |
Mkt cap ! $6.468B |
Open | High | Low | Value | Volume |
$6.95 | $6.97 | $6.87 | $16.72M | 2.418M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 5820 | $6.92 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$6.93 | 15020 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 5000 | 6.840 |
1 | 430 | 6.820 |
4 | 2400 | 6.800 |
1 | 30 | 6.760 |
2 | 3400 | 6.750 |
Price($) | Vol. | No. |
---|---|---|
6.950 | 1000 | 1 |
6.970 | 599 | 1 |
6.980 | 15330 | 3 |
7.000 | 10409 | 3 |
7.010 | 2200 | 1 |
Last trade - 16.10pm 13/09/2024 (20 minute delay) ? |
Featured News
LYC (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online