seperate project at inl gumbles ,lets not get confused in the sept. production is planned of tailings from from on site dam thru hellyer mill in a jv with polymetals the method used for processing is conventional method, this project is projected to produce 63k tonnes of concentrate p a though it is envisaged this will be increased by mixing EAF dust from SSX and or OST to increase capacity of ore treated, the residue from this will go back into tailings dam for future processing via the new technolgy being trialled at demo plant at burnie polymetals are finiancing proccedings at the hellyer mill, it would not surprise me at all if this mill was used in the intrim to be leased out to such companys as AGM or BSM the latter in which INL has a 22% stake Cheers Vin .
- Forums
- ASX - By Stock
- re: good buying at close
seperate project at inl gumbles ,lets not get confused in the...
-
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SDV (ASX) to my watchlist
|
|||||
Last
42.0¢ |
Change
0.030(7.69%) |
Mkt cap ! $75.92M |
Open | High | Low | Value | Volume |
39.0¢ | 43.0¢ | 39.0¢ | $255.0K | 628.4K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 10000 | 41.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
42.0¢ | 19580 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 10000 | 0.410 |
1 | 1766 | 0.405 |
1 | 2500 | 0.400 |
1 | 9300 | 0.390 |
1 | 6000 | 0.380 |
Price($) | Vol. | No. |
---|---|---|
0.420 | 19580 | 1 |
0.430 | 50000 | 1 |
0.440 | 75381 | 3 |
0.445 | 3375 | 1 |
0.450 | 92709 | 4 |
Last trade - 16.10pm 03/07/2024 (20 minute delay) ? |
Featured News
SDV (ASX) Chart |
The Watchlist
TON
TRITON MINERALS LTD
Adrian Costello, Executive Director
Adrian Costello
Executive Director
Previous Video
Next Video
SPONSORED BY The Market Online