Initially, as the pipe is lowered into the hole, it reaches ambient temp at each depth, so progressively expands. The initial installation therefore accomodates all the expansion from the difference between 25degC pipe being lowered into a 200+degC hole.
For changes in temperature:
Depends on how the pipe is held.
If it is fixed top & bottom, then all that happens is the pipe acquires compressive stress, same reason why the (continuously welded) rail line from Sydney to Perth does not buckle.
The stress is contained by the wellhead at the top and the bottom of the hole.Perth and Sydney Central stations in my example, although I have never yet seen a stressed rail employee, so......
So, the pipe expands downward to the extend of its bottom fixing method PLUS it acquires some compressive stress.
- Forums
- ASX - By Stock
- re latest announcement
Initially, as the pipe is lowered into the hole, it reaches...
-
-
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RNE (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $1.690M |
Open | High | Low | Value | Volume |
0.2¢ | 0.2¢ | 0.2¢ | $4.992K | 2.495M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
118 | 211328461 | 0.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.2¢ | 36322597 | 15 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
118 | 211328461 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.002 | 36322597 | 15 |
0.003 | 11734543 | 16 |
0.004 | 2528379 | 7 |
0.005 | 1201800 | 3 |
0.006 | 269000 | 1 |
Last trade - 13.19pm 15/10/2024 (20 minute delay) ? |
Featured News
RNE (ASX) Chart |
The Watchlist
JBY
JAMES BAY MINERALS LIMITED
Andrew Dornan, Executive Director
Andrew Dornan
Executive Director
SPONSORED BY The Market Online