CCI 0.00% 12.0¢ chrome corporation limited

re: pre open here is ann

  1. 23,992 Posts.
    lightbulb Created with Sketch. 2
    29th May 2006
    Manager of Company Announcements
    Australian Stock Exchange Limited
    Level 6, 20 Bridge Street
    SYDNEY NSW 2000
    By E-Lodgement
    Ruighoek Open Cut Feasibility Drilling
    The Company is pleased to announce the continued success of the diamond drilling programme at the Ruighoek Chrome Project. Consequently, the company believes that the ongoing open cut feasibility remains on track for a positive conclusion.
    The consistency of the results to date has allowed the company’s consultants to now reduce the number of the remaining diamond drill holes to the absolute minimum, with a more powerful percussion rig now contracted to complete the infill of the required data to upgrade the present Indicated Resource to a Measured Resource.
    The drilling continues to confirm the presence of the chrome mineralisation in the area between the #10 and #12 shafts amenable to mining by way of open cut. The intersection by 3 holes of additional chrome mineralisation in the form of the LG6A reef, which occurs stratigraphically above the LG6 reef, provides additional resource for the feasibility and with the potential to significantly reduce the stripping ratio of an open cut mining operation.
    Hole Number
    Depth to Top of LG6 Reef
    LG6 Reef Width
    Depth to Top of LG6A Reef
    LG6A Reef Width
    Depth of Weathering
    Final Depth
    RH31
    29.31
    0.79
    13.40
    0.37
    13.80
    33.45
    RH32
    28.95
    0.75
    11.44
    0.39
    12.10
    33.50
    RH33
    36.60
    0.61
    0.00
    17.30
    33.00
    RH35
    26.22
    0.37
    23.69
    0.49
    2.84
    27.25
    RH36
    23.39
    0.54
    0.00
    10.00
    26.65
    RH40
    17.50
    1.30
    0.00
    22.20
    RH44
    16.14
    0.83
    0.00
    8.20
    19.30
    Geotechnical logging of the core drilled to date is now underway. Once the logging is completed, the intersections of reef will be split and sent for analysis.
    Suite B, 150 Hay Street, Subiaco, Western Australia 6008
    Phone: (618) 9388 8430 Facsimile: (618) 9388 8450
    CCI Managing Director, Brian Thomas noted “The results to date with this programme have reassured the technical team that the decision to change to an open cut mining strategy was a correct one. Whilst the initial drilling has been slower than first anticipated, the introduction of a percussion rig will considerably speed up the process. The additional encouragement of intersections of the LG6A chrome seam in a number of holes, not only will add to the size of the resource but reduces mining costs.
    Yours faithfully
    Brian Thomas
    Managing Director
    Chrome Corporation Ltd
    For further information please contact
    Tel : (08) 9388 8430
    Fax : (08) 9388 8450
    Web : www.chromecorp.com
    E-mail : [email protected]
    Mr Brian Thomas is a member of the Australasian Institute of Mining and Metallurgy, has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Brian Thomas is a full time employee of the company and consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.
 
watchlist Created with Sketch. Add CCI (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.