RR1 9.09% 1.2¢ reach resources limited

Let’s hope second phase of drilling goes to plan and management...

  1. 1,372 Posts.
    lightbulb Created with Sketch. 533
    Let’s hope second phase of drilling goes to plan and management come through with the goods. It would be disappointing and a bad hit to Morrissey Hill if we can’t produce the hood second time round. We are doubling the drill output this time and hopefully a broader range. What’s got me stumped is ODE has an announcement to e other day with 1911ppm and their share price went up 75%.

    on the other hand, we have the niobium play and samples should be back within coming weeks. I would love us to have as much as a WA1

 
watchlist Created with Sketch. Add RR1 (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.