RR1 0.00% 1.1¢ reach resources limited

Re rate happening, page-4001

  1. 134 Posts.
    lightbulb Created with Sketch. 49
    Think its fair to say that your analysis for expectations of results is not commensurate with reality. Drilling of phase 2 only completed Dec 12, 2023..

    I guess everyone is entitled to a break over xmas are they not?
    https://hotcopper.com.au/data/attachments/5874/5874952-02e2ef4425ef82430e65952a7a1f4a57.jpg
    https://hotcopper.com.au/data/attachments/5874/5874955-b402c8a756c6c6e56f147e5bd99195b8.jpg
 
watchlist Created with Sketch. Add RR1 (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.