ARL 8.04% 51.5¢ ardea resources limited

Re-Rate Timeline Opinion, page-22

  1. 104 Posts.
    lightbulb Created with Sketch. 44
    Yeah, might be right. Person I was in contact, said it's aim is more of grade control. And holes are about 20 m apart. The company who is going to undertake drilling program, has only 2 AC rigs and rest of the fleet are RC rigs. You might be right and they would use another drilling companies for AC. But here is also a thing - I've mentioned that before, when I was on site, a lot of holes were finished already with starting rods (1-3m). You can't go deeper with AC rig and thus can't test ground for water supply, unless AC bit would be replaced by 1m hammer to go deeper. Ground is really hard and I can't see point undertaking the drilling program with small rigs. They have to be at least big Scramm rigs with more air power - up to 1000psi. Otherwise, completeing the hole takes centuries compared to big rigs and it would be also unnecessary cost for ARL. I might be wrong Rewop, but I let You guys know ASAP, if I get information. I was promised pictures on first hole when rigs are at site and drilling starts. Then my bro can have more information from geo's on site. I might even try to get some geo's contact details, if they, who were at the site when I worked in Gongarrie, are still there.
 
watchlist Created with Sketch. Add ARL (ASX) to my watchlist
(20min delay)
Last
51.5¢
Change
-0.045(8.04%)
Mkt cap ! $102.7M
Open High Low Value Volume
57.0¢ 57.0¢ 50.5¢ $68.64K 127.7K

Buyers (Bids)

No. Vol. Price($)
1 3607 51.5¢
 

Sellers (Offers)

Price($) Vol. No.
55.0¢ 1900 1
View Market Depth
Last trade - 16.10pm 14/06/2024 (20 minute delay) ?
Last
51.5¢
  Change
-0.045 ( 8.04 %)
Open High Low Volume
55.0¢ 55.0¢ 51.5¢ 35594
Last updated 15.51pm 14/06/2024 ?
ARL (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.