We need to get a move on with solar though.
I don't know if this is a valid measure (very rule of thumb) but looking at First Solar with a market cap of $6.4 billion and 8 gigawatts installed, that gives a market cap of around $800K per megawatt installed.
We have 4 megawatts installed = $3.2 million market cap for solar systems.
Add in Mildura Stage 2, that would give us $82 million market cap.
Add in a 50-100MW project in Saudi Arabia that would give us $163 million.
And so on. We really need to get these larger scale projects rolling out....
- Forums
- ASX - By Stock
- re-read mg's letter of 20th may
We need to get a move on with solar though.I don't know if this...
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SLX (ASX) to my watchlist
(20min delay)
|
|||||
Last
$4.53 |
Change
-0.030(0.66%) |
Mkt cap ! $1.074B |
Open | High | Low | Value | Volume |
$4.61 | $4.64 | $4.50 | $1.135M | 250.3K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 874 | $4.53 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$4.55 | 211 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 874 | 4.530 |
1 | 680 | 4.510 |
1 | 1640 | 4.500 |
2 | 1851 | 4.490 |
4 | 21239 | 4.480 |
Price($) | Vol. | No. |
---|---|---|
4.550 | 211 | 1 |
4.560 | 211 | 1 |
4.570 | 1851 | 2 |
4.580 | 1851 | 2 |
4.590 | 1851 | 2 |
Last trade - 16.10pm 10/10/2024 (20 minute delay) ? |
Featured News
SLX (ASX) Chart |
The Watchlist
EL8
ELEVATE URANIUM LTD
Murray Hill, MD & CEO
Murray Hill
MD & CEO
Previous Video
Next Video
SPONSORED BY The Market Online