ABN 42 112 256 649 566 El izabeth St reet Melbourne Victor ia 3000 Tel : +61×3×9347×2409 Fax: +61×3×9349×1186 www.sol imarenergy.com.au 5 December 2007 Manager Announcements Company Announcements Office Australian Stock Exchange Limited 10th Floor, 20 Bond Street SYDNEY NSW 2000 Via electronic lodgement Successful Commencement of Testing at Southeast Lost Hills Solimar Energy Limited (“Solimar Energy�) (ASX Code: SGY) is pleased to announce the successful commercial testing of operations which commenced at the Jack Hamar 3-13 well at the Southeast Lost Hills Project (SELH) in the San Joaquin Basin in California. Solimar Energy’s wholly-owned US subsidiary, Livingstone Energy, Inc. (Livingstone) is Operator in a joint venture with Nuenco NL. Southeast Lost Hills is a shallow gas accumulation where four wells have already been drilled. The Jack Hamar 3-13 well flowed gas at three sustained production rates of 300,000 cubic feet per day (cfpd), 450,000 cfpd and 633,000 cfpd over a 48 hour testing period. The longest test period was at 633,000 cfpd with a tubing pressure of 1,185 psi on a 6/64 inch choke. Livingstone is planning to recomplete and test the other three wells (Jack Hamar 1-12, 1-13 and 2-13) in this prospect area within the next few months. The gas from the commercial wells will be transported through the Joint Venture owned pipeline for sale in to the local energy market. The Joint Venture partners are in discussions with potential buyers of the gas. The aim of testing the SELH operation is to confirm commercially viable production rates from these wells and to better ascertain the reserves potential. Solimar Energy believes there is potential for a substantial gas accumulation in the shallow Pliocene reservoirs. The commercial development potential of the project is enhanced by strong gas demand in the area, abundant infrastructure and high gas prices. Southeast Lost Hills Project To Date Under an earlier property agreement with Orchard Petroleum, Livingstone acquired a 50% interest in the Block B lease at Southeast Lost Hills Project (San Joaquin Basin), including Jack Hamar wells, 1-13, 2-13, 3-13 and 1-12 and the uncompleted pipeline. Livingstone is now the Operator of this project, with the other 50% held by Nuenco NL. Four shallow gas wells have been drilled and completed to date on the northern end of the block. All wells encountered hydrocarbon shows in the Pliocene section but not all were tested. The Jack Hamar wells encountered gas over numerous intervals and an extensive testing operation is planned over the coming months. About the Southeast Lost Hills Project SELH is located in the San Joaquin Basin, along the southern flank of the large Lost Hills Anticline. The Lost Hills structure is a large feature that has already produced in excess of 400 million barrels of oil equivalent (“MMboe�) to date to the north of the Jack Hamar discovery. The SELH gas accumulation is a combination structural stratigraphic trap (see diagram below). The reservoir targets are shallow Pliocene sands that pinch out around the flanks of the Lost Hills Anticline. Seismic amplitude anomalies are associated with the presence of these hydrocarbons. This is a shallow play, with target depths of not greater than 4,000 feet, hence the commercial development costs will be relatively low. Southeast Lost Hills Project Showing Jack Hamar Gas Wells Source: Nuenco NL. (Note that Solimar Energy Limited and its wholly-owned US subsidiary, Livingstone Energy Inc., do not have an interest in the Jack Hamar 1-1 well). Strong Commercialisation Potential The Californian market demand for gas is very strong and in the event that production testing proves commercial, Solimar is confident that gas production can commence in a rapid fashion. Solimar has been in discussions with numerous parties to acquire its gas and has been planning its commercial development. SELH is a low cost shallow gas play that is close to infrastructure and has good commercial potential. Yours sincerely Frank Petruzzelli Chairman Solimar Energy Limited For further information please contact: SOLIMAR ENERGY LIMITED Registered Office: 566 Elizabeth Street, Melbourne, Victoria 3000 Telephone: +61 3 9347 2409; Facsimile: +61 3 9349 1186 www.solimarenegy.com.au
NEO Price at posting:
0.0¢ Sentiment: Buy Disclosure: Held
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.