shallow drilling program begin in April and last roughly 2/3 months....
9 holes to be drilled to a depth of 200m each...
Total of 1800m depth to be drilled in total along 2km zinc/lead anomily.....
Results due in June with the possibility of high grade interceptions...
Should have a nice run up to results....
- Forums
- ASX - By Stock
- EUZ
- ready to move?
ready to move?, page-9
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)