Last week we sent 20 tonnes of tailings to the same CIL plant as the underground material for testing. We are running 100 tonnes in 20 tonne batches of the same tailings through HM3 this week for comparison. This will conclude the CIL testing. Results to be released concurrently. https://t.co/3EYvnEC0Fs
Last week we sent 20 tonnes of tailings to the same CIL plant as...
Add to My Watchlist
What is My Watchlist?