GAM used to run off of generators in principal, with some grid electric to the offices from memory.
The power lines pictured above also run to the stations near by along Round Oak Road.
Will be interesting to see if the pour is on schedule; as others allude to, it’s not a quick process including recommissioning the plant (granted it hasn’t been that long since the Wallace pits finished).
wonder if anyone has looked at the TSF at GAM as a source of low grade, readily processable material… a lot of work in NSW assessing TSFs for critical minerals atm.
- Forums
- ASX - By Stock
- Real timing for gold pour
GAM used to run off of generators in principal, with some grid...
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TBA (ASX) to my watchlist
|
|||||
Last
2.6¢ |
Change
0.000(0.00%) |
Mkt cap ! $33.12M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
TBA (ASX) Chart |
Day chart unavailable