LOM 0.00% 6.7¢ lucapa diamond company limited

Reality Check, page-3

  1. 5 Posts.
    Anybody can tell how many m3/day of material are they moving nowdays? One excavator, loader and dump truck should be able to do at least 100m3 today considering a haul distance of 10 km to the DMS. Therefore we should expect 20 carats announced a day!!!
    Thoughs plz!!!!
 
watchlist Created with Sketch. Add LOM (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.