NTU 5.00% 2.1¢ northern minerals limited

reasons to be bullish ntu, page-16

  1. 2,362 Posts.
    Ausheds,

    Thanks for your thoughts.


    LYC stage 1 is set to produce 11000 t/pa and stage 2 increases production by a further 11000 t/pa (Total 22000 t/pa)

    Duncan has not been factored into either stage 1 or stage 2 - and the output of HREEs is stable between stage 1 & 2

    The size of the Duncan resource is 366kt vs 1057kt at CLD.

    Assuming LYC develops Duncan and uses the ore as feed, it would be reasonable to assume that annual production from there would be roughly 3000tpa - based on lower grade, smaller tonnage, lower recoveries and limited plant capacity (22kt/pa).

    Assuming a 3000t/pa production rate from Duncan, LYC would produce the following:

    La 23.9% 717 tpa
    Ce 39.0% 1170 tpa
    Pr 4.8% 144 tpa
    Nd 18.0% 540 tpa
    Sm 2.8% 84 tpa
    Eu 0.77% 23.1 tpa
    Gd 2.15% 64.5 tpa
    Tb 0.29% 8.7 tpa
    Dy 1.36% 40.8 tpa
    Hm 0.21% 6.3 tpa
    Er 0.46% 13.8 tpa
    Th 0.04% 1.2 tpa
    Yt 0.20% 6 tpa
    Lu 0.03% 0.9 tpa
    Y 5.30% 159 tpa

    Dy and Y output is very modest and would have almost no impact on boosting Rest of World security of supply.





 
watchlist Created with Sketch. Add NTU (ASX) to my watchlist
(20min delay)
Last
2.1¢
Change
0.001(5.00%)
Mkt cap ! $147.0M
Open High Low Value Volume
2.1¢ 2.2¢ 2.1¢ $144.5K 6.876M

Buyers (Bids)

No. Vol. Price($)
31 8077555 2.0¢
 

Sellers (Offers)

Price($) Vol. No.
2.2¢ 3093443 8
View Market Depth
Last trade - 15.50pm 08/11/2024 (20 minute delay) ?
NTU (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.